Friday 23 May 2014

And just for more entertainment...we did this too!

This is my/our Lab...a workshop and storage area...escape area.



On piles, ready for cleaning and occupation.



We have landed.

The woolshed is safely on the piles with a wee bit of jiggling. Next we have to fix one end of the internal gutter and cover the side where the lean-to was removed. Then it will be general tidying until I sell my property.


This is Totara. The wing (gable/side) that will eventually be the bedrooms, bathrooms, washhouse entrance.

Tuesday 6 May 2014

Piles of 'Em

Piles in, all inspected. We are still up in the air until tomorrow morning. Central movers are amazing. Look how tidy they are underneath. I love these guys...





Thursday 1 May 2014

And

Tune in over the weekend folks. We will continue the entertainment.
To come:
  • Hats on
  • a ramble around the footings
  • and a tour inside our future home with hints of her future internal layout.
Ok the roof is on. Holes for piles (300 of them) also dug today but haven't any new photos yet.




Wee hole digger


Uniting the Sisters on Sight: With Movement and Voice

This morning 7m joined her sister, 9m (7m wide gable & 9m wide gable)


 

  

Last 2 sections of the roof waiting to come on site.
This older gable has shingles as well as the totara sarking under the iron


Waiting to be United

Here are the last pieces waiting for the trip through Caterton and Greytown to join her sister.



We're 1/2 on!

So exciting. One of the gables is in situ. Waiting for her mate to arrive.
The first 1/4 of the roof to be on our land

The second 1/4 approaching our boundary

The 9M wide side about to be put in position